Hello everyone,
I'm trying to design a three-pahse inverter/charger (Quattros) system that can energize a certain amount of loads (with only energy from batteries) within a certain schedule. Outside of that schedule, it should be able to power the loads using the energy from the grid. Is there a way to configure an assistant to help with this configuration setup?