I'm getting very confused by my internet research, by my calculations to get the max draw from the batteries to the busbar 700a to the invertor and the 12v system is roughly 600a so my cabling needs to match that the the busbar. Is this correct. So 120mm2 cable or would running two 90mm2 cables be better advised or at risk from melting...
The rest of the system is in place and just confusing myself with this last little bit... undoubtably the most important which is why I am 2nd guessing what I am researching.
If anyone can help that would be great