For charging EVs or Boosting Hot Water elements with excess solar power. I thought it must be possible to engage the Multiplus II aux AC-2 output to run dedicated loads once the batteries have reached float for a given length of time. I can't seem to find this option in the Multiplus II Manual anywhere. Is this possible, utilizing excess solar power off the top of full batteries and without the need for a generator or other ac input?