Good day all
I have a question for the more experienced members here.
I have a Multiplus II 5KVA with a Smartsolar 250/85 charge controller, 12 x CS350 watt panels and a 10kwh lithium bank.
The house is equipped with a gas geiser and stove.
Power consumption was measured with logging device for about a week and peaked at 4.9kw with an average of 3.4kw throughout.
My question is can I feed the main AC from the grid through the Multipus with the main DB box connected to AC output 1 ( no break ) on the Multi.
Given that I will setup the ESS system to keep batteries charged and only use battery during load shedding.
The aim is to gain as much savings possible from PV and not have the hassle of splitting loads between AC outputs on the Multi.
I hope this makes sense?
Your input will be greatly valued.