Hello,
with a Multigrid-II running in an AC coupled on-grid ESS configuration, is/would it be possible to make a battery capacity test by
- asking the multi to stop doing the normal ESS work and
- asking the multi do e.g. a "charge => {0.1C / 0.2C} discharge => charge cycle"?
Thanks & Groeten - tullsta