Hi,
I am considering adding a MultiPlus(-II) to an existing off grid power system (see above) with the following objectives:
1. Test various battery banks in a real life scenario. 2. Add battery capacity to the system so we can continue to charge an electric car during the coming winter. 3. Add redundancy to the power system; we lost equipment last year in a exceptionally heavy thunderstorm due to lightning.
The PV inverter(s) are (obviously) rate limited for the MultiPlus and MultiPlus-II, ie. solar generation will not exceed the capacity of the Multi's.
Are there any issues/concerns that need addressing with this set up?
Jan