I have a question regarding running two identical MP in parallel (on a 230 single phase) with two different AC current limits.
One MP has a limit of 16A and the second a limit of 10A (both not overurlled by remote)
The second MP is used only for discharging so inverter only. I don't need the charging functionality.
If a standard MP parallel set-up is not possible is it possible to set-up the second MP as a "inverter power assist generator" ?
So the second MP only kicks in when the requested power is higher than 3000W?