Hi
I know this is no Pylontech Forum, but please bear with mef or a moment.
I have 8 Pylontech US2000C modules in a rack. I now have installed a second rack and installed additonal 4x US2000C (4x to come end of the year). Both battery racks are independently connected to the busbar. I used a default flat network cable to bring the 2nd linkport of battery 8 to the 1st linkport of battery 9 in the second rack.
However, upon putting the second rack under power, switching from off to on on the 4 new batteries, hitting the red SW button on the master battery (battery 1 in rack 1) ... nothing happend.
So I am asking myself... how is the correct order of doing things?? Somebody already did what I am trying to do? Help would be appreciated.
Thanks :)