Hi
I have a offgrid system with a 17,5kw Kohler generator, solarcharging, Multipluss 2 3000 35-32. And a cerbo gx.
Between the system and the house (approx. 30 metres) there is a 3-phase cable which is connected in the fuse box. The question is then whether I can connect L1 & L2 to multiple plus and L3 directly from the generator and distribute like a normal system 3 phase system?
Then I take out 1 phase where it is available for lights, TV, charging etc. while the remaining components that do not need power without starting the generator are left with voltage on one phase?
Will there bi at phase missmatch when starting det generator before the multipluss switches?
Has anyone built such a system? Is the correct way to separate this system completely?