Hi,
Following is my system setup:
- Cerbo GX version 2.9.1
- Quattro 48/10000/140-2x100 with FW version 2653508
- BlueSolar Charger MPPT 150/85 VE.CAN with screen and buttons version 2.05
Quattro is connected to the cerbo via VE BUS and MPPT charger is connected via CAN.
I noticed that the voltage read by the Quattro is always lower than the real value that is read by the Charge controller or the value read using a multimeter at the batteries poles (or the value read at the inverter batteries connectors). Following are some screenshots illustrating the case:
Photo of the voltage showing on the MPPT charge controller:
Photo of the voltage read by the Quattro:
The value on Quattro is 49.36V whereas it is actually 49.76 V.
Can you please help me identify the problem and how to resolve it?
I tried using the v-sense connected to the batteries poles without luck.
Regards, zricha