Hi,
My basic ESS will be:
- Grid
- Energymeter ET112 on grid
- All loads connected to grid
- Multiplus II 48/3000 + Cerbo GX- AC-in connected to grid
- PV system (Hoymiles micro-inverters)
- connected to MPII AC-out 1 or 2 (obeying to factor 1.0 rule)
- Battery Pylontech, 1x US5000 or 2 US3000C
Overall average max usage 500W daytime / 250W nigthtime.
Power of the MPII 48/3000 or batterie(s) will be exceeded by hotwater boiler (max 2.7kW) or induction cooker (max 3.7kW/3.1kW).
Boiler and induction cooker will not be used at the same
My questions are:
1. Will the MPII be able to timely add power from grid to avoid overload to itself and/or battery? Latency?
2. Any other means to overcome overload by settings MPII?
Thanx Jaap
Netherlands