Hello All, Looking for some help. I have the following setup: 1. MultiPlus-II 48/3000/32-32 2. SmartSolar MPPT 250/70 3. Two Pylontech US2000 batteries Can you please help me with a short circuit how to connect these devices for such conditions: 1. When the MPPT (Maximum Power Point Tracker) generates power, prioritize charging the battery to 100%. Once charged, direct MPPT power to the AC load without depleting the battery it. 2. If the MPPT isn't generating power, rely solely on AC power. 3. In the absence of AC grid power, utilize MPPT power if available, then switch to battery power. 4. If the AC grid is available but MPPT isn't, charge the batteries to 100% using an inverter. I think this workflow is possible, however, I don't know how to set it up. Really appreciate you help.