Looking for advice on soft starting larger systems
For exaple we have two 10k Quattros in parallel and 3 mppts, using Pylontech usually works no issues but we have switched to BSlBatt and they dont seem to have the same soft start, on a larger system they will go to alarm even with both inverters off the batteries still alarm and we have to start the system with AC to get the batteries online avoiding inrush spike.
Is there something we could add to the DC side to avoid this that an end customer could use and dosent need to be removed from the circuit? All I can think of is to have seperate DC breakers for each inverter and the MPPTs so we can start everything one by one.
Suprised more people dont have issues with the inrush current, I have seen Breakers fuse and even seen the battery cables move from this massive inrush!
Thanks