VE Multiplus II 5kVa installed with a cerbo GX, GX Touch 50, 2x Smart Solar 150/35 MPPT's, 6x 455Watt PV Panels and a Hubble AM2 48V 5.5kWh LiFePo4 battery
System was originally setup as a battery back-up (UPS) with an auto changeover switch before solar panels where added is now setup with ESS. The changeover switch is set to manual operation and inverter remains on
Previously auto changeover fluctuated between grid or inverter depending on grid availability. The changeover switch now remains on inverter feed.
My challenge is the house earth leakage trips when the grid is restored following a loadshedding. This did not happen in the past while on UPS mode with the auto change over switch fluctuating between inverter and grid when grids available
Any advice what may be the cause and how I can try resolve the issue
Thank you for your willingness to assist