Hi there please assist.
I have a 3 x 3kVa Multiplus 2 inverters connected in 3 phase configuration, with 2 MPPTs and a Colour Control GX The limiting is being done by a Carlo Gavazzi EM24 meter, and it's connected properly, as per manual All equipment is on its latest firmware.
The system exports a significant amount of energy , average of 4 to 5 kilowatt hours per day.
On ESS setting on remote console, I have tried to change the Multiphase regulation between INDIVIDUAL PHASE and TOTAL OF ALL PHASES, but it's not making any difference
What could the problem be? and how can I solve it? Thank you