Long story short..
I have an SBP100 that I want to use to switch on/off my rooftop solar system. It would be switched off when connected to shorepower or a generator, etc. I'll basically be using it as a remote relay switch with low voltage cable run to a panel switch elsewhere. I know the SBP is way overkill for this but I already own it so..
Should I put the SBP in between the panels and the MPPT or between the MPPT and battery? Logic says I should put them between the panels and MPPT so that the MPPT doesn't see any power it can't deliver to the battery. However, I'm concerned that the SBP will not be able to activate without sunlight hitting the panels (let's say I want to activate the panels at night so that they start charging in the morning). If I put the SBP after the MPPT, then in theory it should work as I want it to but I'm concerned that the MPPT will receive a bunch of energy from the PV at all times that it can't dispatch. Is that harmful?