I am a little confused by the MPPT 250/100 manual regarding earthing. I intend to run an earth cable from the frame of my solar array to an earth busbar in a combiner box which will be situated about 3 metres from my domestic distribution panel. The earth cable from the surge protection device will also be connected to the combiner box earth busbar. This busbar will then be connected to the main earth busbar in my domestic DB. This cable will pass within 30 cms of the earthing screw on the casing of the MPPT. Can I run the cable to this screw and continue on to the DB board? Is it really necessary to earth the casing of the MPPT? I would appreciate some advice/comments.