Hello there.
I have a Multiplus II 5000 VA with 2 MPPT 250/60 (with a VE direct port)(I will add a 3rd string / 1 MPPT 150/30 in two weeks giving 8.2 kWp of PV modules) and a Pylontech Force L2 (3 modules or 10.65 kWh) linked via a Lynx DC distributor and controlled via a Cerbo GX.
Is it possible to add 2 Pylontech modules Force L1 with their own BMS to this system ? The Cerbo GX has 2 BMS Can inputs: can it control or be controlled by two (Force L1 and Force L2) Pylontech BMS ? If yes, I would just need a 2nd Lynx since the 1st one is full (already 4 DC IN).
Cheers from Liguria and a nice sunny day today