Hi,
Is there a way to set the charge rate (drawn from grid) in ESS scheduled charging?
When I activate scheduled charging the system starts to charge batteries at its maximum current capability and this exceeds the power of my contract, so the company meter opens the circuit because of maximum power exceeded.
I have two multipluses 5000 48 working in parallel and 21.6kWh batteries.
Thanks community!