My SE 27.6K inverter with 32.55kwp is installed on a separate production fuse straight after the grid meter. If a grid blackout happens I want the SE inverter to work.
Will the following flow work?
1. On blackout, switch the SE inverter to the output of the MP2.
2. Limit the SE inverter to 5kw (factor 1:1 rule) with a relay.
Configuration,
Enable phase shifting on the SE, config a PV in the MP2 as installed on the AC out side.