I hope to use a Multiplus 2 as a grid tied inverter. I live in rural Scotland. Although I have mains electricity, my DNO has put significant restrictions on the maximum size of a grid tied PV inverter I can have. Apparently the infrastructure around me is ‘fragile’ I am allowed a maximum of 7.36 KW with an ELS so that I never export more than 3.68KW.
I hope to get around this by having a large PV (circa 17kw) array to charge a suitably sized battery bank (in the style of attached picture but without the Genset).
My question is around controlling the output of the Multiplus. I plan to use the 8000VA model as specs say its continuous output power is 6400w, but its peak power is 15000w. I am worried the DNO might use the peak power as an excuse to say no. Can limits be set so that the output power of the Multiplus never goes above 7.36kw?
I know it seems a bit ridiculous, but the DNO have final say here, and ultimately a grid tied system will be so much easier to integrate into my house.
Thank you