Hello everyone. Could someone comment on wiring schematic below? I need full backup for all loads without critical loads split. Ignore BMS unit shown as Victron, it is BYD unit.
Can I have loads connected directly to 3 phase mains supply? If not than all loads need to be connected through AC OUT 1/2 in multiplus in which case is AC OUT 1 limited to inverter rating of 5k?