I have a question which ones of solution is better and if it is necessary to solve it or nor.
1) multiplus II GX 5kva
3x mppt 150/35 bluetooth ; (optoinal + 2x mppt 150/35 bluetooth)
victron ET340 (it is necessary ?)
4x pylontech U3000C
12x 500wp mono panels (3stings of 2series x 2parallel) 6kwp ; (optional + 8 panels and 2strings of 2series x 2parallel together 10kwp)
It is possible to connect 5strings in to GX ?
2) easysolar 5kva (gx+250/100) (optoinal 2x mppt 150/35 bluetooth)
victron ET340 (it is necessary ?)
4x pylontech U3000C
12x 500wp mono panels (1stings of 4series x 3paraller) 6kwp ; (optional +8 panels and 2strings of 2series x 2parallel together 10kwp)
A solution with three strings occurred me to because in the afternoon I have on the roof of the shadows from another house. See picture. And whether it would not result in a reduction in performance, when it was in one string (mppt 250/100).The question is if the mppts 150/35 will by charge the battery well, or better as 250/100.
Subquestion:
My house is feeded from grid 3-phase, but I want one phase use to plug to the multiplus II(easysolar II) and have this phase as a backup (for appliances), which I would like to use in the evening from the battery and during the day from the sun, plus the surplus sent to the grid. It is this possible ?
Or I want to much ?
Lot of thanks for help.
Juraj