Hello,

I have a solar array charging a large battery bank using 2 x mppt 250/85 (24v System). this then connects to a Multiplus 5000/24 running ESS to run the house. This system is working fantastically well. About to add more solar and another 2 MPPT's

I have just bought a zappi Mk2 car charger (7kw).

I am planning to buy another Multiplus 500/24 and run in parallel.

My question is - Is possible to limit the Zappi to a low current charge until I have excess energy from the Solar panels i.e. the batteries go into absorption. If I had an AC solar system the Zappi can handle it, by putting a CT clamp on the invertor output. It seems it cant from a DC system.


I currently have a light that comes on in the kitchen to say there is excess solar (triggered from the Multi relay outputs).

Hope this makes sense.

Many thanks.

Multiplus-II
9 comments
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

xtopher avatar image xtopher commented ·

I am hoping to find the same thing. I have a Zappi already but looking to get a MPII to run ESS and then add solar to it. While just ESS and no solar, I will use my off peak energy tariff to charge the batteries and charge the Zappi on the same tariff, not using the batteries. But when I add solar, I want to be able to use just excess solar for Zappi as batteries wont be big enough to support it.


I have been wondering, can you set the MP2 to only export excess solar? As that if you are running an ET112, it can monitor export. Tell it to ordinarily have zero next export when there is no excess solar, so Zappi wont try and soak up anything (as it also monitors grid excess and there isnt any). MPII can give as much energy as house needs to satisfy demands but no more. Then when there is excess solar, always export it, and anything that then tries to go to the grid, the Zappi will see and will take up itself. Can that be made to happen?

I am currently in talks with a supplier and they are suggesting using MPPT controller behind the MPII to do my solar in the future but if it wont work with the Zappi, I think I will get a Fronius AC and put it infront of the MPII to allow the Zappi and Eddi to have the excess. Depending on how I grow my solar and batteries, can always have an MPPT powered array as well on the other side of the house just for the house and batteries maybe.

0 Likes 0 ·
dansonamission avatar image dansonamission commented ·

How are you trigging the multi to indicate there is excess solar? I have looked through the assisstants and can only see SOC.

0 Likes 0 ·
h-copter avatar image h-copter commented ·
Hi @Richie Gorrod @David Gould @Xtopher Just wondered if you have an update on how this is working for you? I have same system as @Richie Gorrod so am keen to hear what works. Thanks
0 Likes 0 ·
Show more comments
7 Answers
gregdon avatar image
gregdon answered ·

I have a slightly different system - here is my experience if this helps. I have a Quattro, 8kw, running in ESS mode. I can control how much energy to flow back to the grid. If I set the Quattro to send back less than 1.5kw then the Zappi never sees enough Surplus to commence charge to the car in eco+. (minimum charge to the car is 1.4kw) I have the slider control on the Zappi app all the way over to 100% green so that it will only use Surplus solar energy. Perhaps you could set the Zappi eco+ mode to 90% green and draw just 10% from the Grid? by the way, my Quattro switches on the export mode while in Absorb at about 95% SOC.

One criticism I have of the Zappi CT´s is that they are all AC so measuring what's coming off my panels or what's coming from my batteries is not possible. I have a CT installed on the output, (AC), of my inverter, never seen anything displayed on the Zappi screen from that CT.

1 comment
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

dansonamission avatar image dansonamission commented ·
Are you using an assisstant to turn on and off PV export?
0 Likes 0 ·
lackland avatar image
lackland answered ·

One option is to use the "e-sense" input on the Zappi, which can be configured to stop/start charging. Wants a low-current 240V signal so you'll need another relay.

Details are in the Zappi manual. A related keyword on forums is "Economy 7", the name of the overnight electricity tariff this feature was first designed for.

2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

richie-gorrod avatar image
richie-gorrod answered ·

Amazing Thankyou for the info will take a look.

Will pop Relay on the output from the multi once it goes into Absorption.


1 comment
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

dansonamission avatar image dansonamission commented ·
Where can i find the option for turn on relay once absortption is reach or are you basing this on battery SOC?

Thanks.

0 Likes 0 ·
alan-falck avatar image
alan-falck answered ·

Hi guys, I have a MPII 5Kva GX and BSL5.2 Kva battery with 4kw solar. I also have an ET112 Energy Meter to control my ESS Self Consumption profile. I have a Zappi II and 2 CT Clamps, one on Grid and the other 'Generation Only' mode connected to the Victron AC out.

The challenge I face is the Zappi waits for surplus power in Eco mode but never sees this because the Victron diverts all surplus to 1) Critical loads 2) Battery 3) 'non-critical loads'. As I don't have grid feed-in, I think the voltage is always just less than the grid (to prevent feedback) so the Zappi fights with this setup.

My thoughts are It's probably better not to have a second CT clamp on the Zappi and let Victron itself divert surplus power to the Zappi. I would love to hear your views on this. FYI I did find some helpful info on the MyEnergi (Zappi) forum https://myenergi.info/zappi-victron-multiplus-ii-battery-storage-t3482.html this is my identical setup...Alan


2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

xtopher avatar image
xtopher answered ·

I could be wrong, and may be better to ask on the ME forums, but removing the CT on the export will mean the Zappi is unable to ramp up/down to meet any excess. As such, it will work but you wont be able to use that ability and you will have to just tell the charger to start the charge and it will go flat out at 7kW (assuming you have a 1ph Zappi).


Are you not allowed to export at all?

2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

David Gould avatar image
David Gould answered ·

I am just about to take delivery of a Zappi and will control it with esense. I have solar panels and battery bank and will turn on the zappi when the batteries are at the required level, this is calculated based on time of day and weather using node-red to control a relay. I wish i knew you to get node-red to see the level of charge in the car?

2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

hanszw avatar image
hanszw answered ·

Hi everybody,

I have a DIY Enphase AC system with zero feed in, and thinking of buying a Multiplus II GX with Pylontech battery's

To be prepared for EV and maximum use of solar excess energy I was looking also for the Zappi / Eddi hot water solucions but like I see this it can't be possible without using a Feed back to the grid option

Victrons new EV charger NS also has a eco solar charging option and my question is if will work without feed back to grid enabled?

https://www.victronenergy.com/ev-charging/ev-charging-station-ns

I life in the South of Europe and prefer to use the grid only for bad weather backup, if I accidentally feed in back to the grid I will be charged for it like consumption as well


Thanks for replying





2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.