Hi,
i have a 3phase System with 3 Victron MPII 48/8000 and 150kWh lithium Storage (18s)
Now i would like to add a genset as cogen. (Synchronizing).
is it possible to connect the Genset with critical loads (AC Out 1) ?
Or is it necessary to use the ac in?
i have to add a em24 for the genset is the produced energy counted correctly in vrm also if the genset is connected to AC Out 1.
thanks a lot :)