I am setting up a 3 phase system (3 x 5kva Multi) with AC coupled inverter on Pylontech with a cerbo. This is in a remote area with limited grid connection. The generator is 3 phase and will be connected to the inputs of each multi.
The grid is only single phase so can I connect a fourth multi to the battery bank and run it as a charger only when the grid is available and will the cerbo recognize it as a charger?