We need to know which parameter is there to send the command to the Easysolar inverter and which parameter is there to know when and how much to send the command.

CCGX Color ControlModbus TCP
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

4 Answers
Mike Dorsett avatar image
Mike Dorsett answered ·

Interfacing-with-VE-Bus-products-MK2-Protocol-3.12.pdf

Will have the answers that you need. Your question does not sat what you are trying to do, or give any detail of your setup which would make it easier to answer.

2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

js-solartech-india-pvt-ltd avatar image
js-solartech-india-pvt-ltd answered ·

Actually we want to connect easy solar 24|3000|70-50 inverter with third party monitoring. we are not able to understand that which parameter is there to send the command to the inverter and which parameter there to know when and how to send the command. This quires is related to GX modbus TCP resister mapping.

2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

Mike Dorsett avatar image
Mike Dorsett answered ·

you can MONITOR the inverter over the MODBUS map in the GX device, this is done by sending a normal Modbus TCP/IP command to the GX's IP address. Initially you also have to enable the modbus access in the setup menu. how often you send the requests is up to you, but faster than 1 sec is probably not recommended. There is a document: "CCGX-Modbus-TCP-register-list-2.60" that gives the register addresses and their functions/units.

1 comment
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

js-solartech-india-pvt-ltd avatar image js-solartech-india-pvt-ltd commented ·

We are doing but not able to understand this following point.

  1. Which parameter and register number (complete details) to pick for controlling( when the battery charges more).
  2. Which parameter and register number to send the command to inverter once it charges more.
  3. How much command should be sent to inverter as per the Serial number 1.
0 Likes 0 ·
js-solartech-india-pvt-ltd avatar image
js-solartech-india-pvt-ltd answered ·

We are doing but not able to understand this following point.

  1. Which parameter and register number (complete details) to pick for controlling( when the battery charges more).
  2. Which parameter and register number to send the command to inverter once it charges more.
  3. How much command should be sent to inverter as per the Serial number 1.
2 |3000