Two cranking batteries wired thru 3 way switch: Bat 1, Bat 2, both. Negative leads parallel to negative bus. I understand the shunt goes in the negative lead. The shunt power wires to Bat 1; 2nd 702 input wires to Bat 2. 702 set to monitor voltage on 2nd battery. Question: Should total AH entered be sum of both batteries? When engine runs switch is set to "Both" so both batteries charge. When engine is off switch is moved to either Bat 1 or Bat 2. Will this set up work to give me some idea of status of both batteries? Or does someone have a better setup method?