Hello,
We are designing 3+3 kW system. Because of financial constriction and pressing need to upgrade the current system we are planning to build our new system in two phases.
First phase would be 1 x Victron Multiplus II 48/3000, 1 x Fronius Primo 3.0-1 with around 4kW of PV, 320Ah 48V traction battery system (24 * 2V batterys) and Cerbo GX for system monitoring.
The second phase should be implemented next year. We would then add another Victron Multiplus II 48/3000 in parallel with the first one and another Fronius Primo 3.0-1 with around 4kW of PV.
This is a offgrid system, most of the power usage is during the day.
There is a 2kW generator for backup.
In addition to that we would probably add a micro water turbine (PowerSpout), also AC Coupled trough Ginlong Solis Mini string inverter. We could get from 500 to 1000W form the PowerSpout. I know that this takes the system over the 1:1 rule. But water turbine would be used when there is no PV power (bad weather or night).
I don't have the exact question, just need the sanity check for this long term plan.
Thank you!