Hi All,
I'm excited about the RS Mppt range, more panels is series, less amps flowing. I used to implement combiner boxes with the 250v range (12 panels, 4 series, 3 groups parallel).
Now I want to string 2 parrallel strings of 6 panels (420Wp).
I want to run 2 cable pairs respectively (4-6mm cables) directly to the 2 independent trackers of the new Mppt.
Where do I fuse the strings:
Inline fuse on the roof closest to the PV panels? (maybe best to break the power closest to the generating source) or at the DB box close the Mppt in the house near the DB where the DC isolators/breakers and DC surge protection is?