Hi,
I am trying to set up 3 phase/2 parallel system based on 6 MP-II.
How to set the master and slave in each phase?
This site is now in read-only archive mode. Please move all discussion, and create a new account at the new Victron Community site.
Hi,
I am trying to set up 3 phase/2 parallel system based on 6 MP-II.
How to set the master and slave in each phase?
Hi,
Have you completed the 3 phase and parallel theory and practical training in Victron Professional?
https://professional.victronenergy.com/online-training/
I would be interest to hear if you had and it was still unclear. I could then make some specific improvements based on the steps you think are missing.
Once you have confirmed which units are connected in parallel in master slave to each other, this is how the programming should look:
Hi @Guy Stewart (Victron Community Manager),
Yes I did completed this training and even got the diploma :)
And Yes, after I moved my MP-II pairs to respected "phases" I got the screen to look like yours.
Your screenshot shows in the "System check" box as "OK, Setup not send to system yet!"
I hope, to finish the setup I have to send it IN.
So I did, and at the end I had, in the "System check" box, only green "OK".
Before I moved them from the right to the phase "boxes", I renamed them to know which is which.
Now when I click on the phase boxes 1, 2 or 3 on the left, I can see, on the right, the units assigned to each phase.
It is not the first time I use VE.Bus System configurator.
I used it first to set up a 3 phase/1 parallel system out of 2 MP-II and 1 EasySolar-II.
Everything went OK than and it worked for 6 moths.
Now I want to add additional MP-II to each phase in parallel because I was getting an overload warnings because a load was sometime over the one MP-II limit.
I even payed (in advance) the Victron installer to do this job, but he came in with new MP-IIs and some needed hardware, told me what to do and went his "Merry Way" to more important clients.
So I did all the rewiring and waited for him to return and set it all up.
He promised to be back in on last Tuesday morning.
Than, on Wednesday, he called that he will come Thursday or Friday.
"No show" or call so far.
To be fair, he did not specify which week or month this Thursday of Friday will be. :) (it is not funny)
So I am trying it myself, because in 2 days there will be no power from the grid for whole day due to some repairs.
So far I have all kinds of LED lights flashing on all MP-II (except ES-II because it has no LEDs).
I would have included a video of those LEDs flashing on each MP-II but this system is not accepting my "mov" files. They are quite entertaining.
Here what ES-II is showing in terms of errors.
So, the questions are:
How to make one MP-II a master and the other Slave?
What the heck is this overload error when there is no load connected?
Best Regards,
Marek
Parallel, split- and three phase VE.Bus systems manual
Theory on wiring large systems PDF
Three-phase and parallel system theory training presentation
Three-phase & Parallel installation training video
Parallel, split- and three phase VE.Bus systems manual
Theory on wiring large systems PDF
Three-phase and parallel system theory training presentation
27 People are following this question.