Hi, i am new in this business and read a lot in the documentation and web but did not find a valid solution for my question.
I have a grid connection on 3 phases and want to add some PV modules to generate my own electricity. Besides the PV Modules a have a single phase connection with maximum 32A.
My question is: Can i use the single phase connection as input for 3x Multiplus II to create a 3 Phase system?
Can i configure the MutliPlus to use max 32A input for the sum of the 3 Multiplus? I know i can configure the input for each Mutliplus. But use 10 for each multi is not a good solution in my mind. Maybe Phase 1 has a load of 30A und 2 and 3 have 0, then the battery will be used but it is not necessary.
Maybe a better setup will be one Multiplus with 5000VA?
Thanks for your help.