I've got a Fronius on AC OUT and it is shown wrong on remote console.
The correct flow is the one i have drawn with the red arrows.
Why's that?
Any possibility do modify that? or will it be corrected in one of the next firmwares?
Flow should go from PV-Inverter to AC Loads.
The existing path (blue connection) to Victron should be used afterwards. (second red arrow not necessary.)
regards,
Andy