Good Morning Guys
I have recently installed a Multiplus ii 5Kva with a Dyness 3.6kwh battery pack to help with critical load during load shedding.
I have also installed a Victron MPPT Charge Controller (older version) 150/70 with just 2 Art solar 370 panels for now to test.
I also have a Colour control installed.
My issues are:
Inverter is on Sustain/ passthrough and does not kick in for load shedding?
I managed to make up the cable for the Battery pack and found it in CC but after changing to 500kb bus the older Charge controller looses connections it prefers 250kb what do i do here?
Friday in Durban we had a major storm and my network switches blew, after this the CCGX ethernet port is offline, normal functionality is working etc just no remote support, one new error i see is data corrupt. any ideas what is going on here?
I didnt have a Victron guru to program it for me as yet as install was done in late Dec, my electrician still has some work to do in separating loads etc.
Can someone in Durban be able to come out and have a look for me help with my issues etc?