In rare cases I need some extra power, but mostly not. So I'd like to be able to switch off the second multiplus (not multiplus ii) in a parallel installation, in order to save some (battery) energy. If more power needed, I'll switch on the second Multiplus.
Is this possible? And must that second multiplus be the slave, or can it also be the master?