I have 2 MultiPlus 3000 watt units to power my sailboat 50 amp 240 Volt USA type panel, one inverter for each ac line. When inverting the units work about 5 to 10 minutes and then have a synchronization/timing error. It does this using only single phase 120 volt appliances on each output line or using two phases such as the 240 volt hot water heater. I am not exceeding over 2000 watts on either inverter line. Current setting is for Dual Phase 180. L2 Floating with return to original phase. I have 3 x 300 amphour VIctron lithium batteries for the DC source and 1200 watts of solar inputing through 3 Victron MPPT units.
Should I change the L2 setting to Fixed or L2 Floating only without return to original phase?