We have an installation that we would like to convert from and three phase supply with neutral, to a single-phase configuration. Now getting to single phase is simple by removing the other two phases out of the equation. The tricky part is that the single phase will supply three 10kvA quattro’s 230V and these will be connected to three separate single phases connected to three separate and independent loads. To add more complications is do I add an PV grid tie Inverter to each line apart on the Quattro output, or one three phase Pv grid tie to all three quattro’s (the probability of unbalanced loads will always a factor)? Now to make even more interesting an additional 30kw single phase generator will be replacing the grid coming from outside to property.
My question is if this will be possible , if not what will be the solution ?