I have a victron 48V bank (4x200Ah smart), bms, smartshunt, cerbo, BlueSolar Charger MPPT 150/45, batteryprotect, li-charge and multiplusII (yes, all in on victron stuff :) )

Goal is to have it autonomous as much as possible.

Currently when charging, the systems always tries to charge to 100% where the bms is shutting down multiplus and the li-charge relay where the solarcharger is connected. As I don't want the batteries to sit at 100% for long (which they then will do during summer months when we have plenty of sun) in order to keep battery lifetime as good as possible, I'd like to define a upper limit like 75% SoC perhaps. The system should then try to charge to 75% and at that level only add energy (via solarcharger and/or multiplus) as needed in case of load to keep it at 75%. And yes, I would need to now and then charge up to 100% so the SoC measure isn't drifting off. The manuals suggests once per month so can be a manual thing todo, perhaps with some notifier via VRM...

Similar for the lower limit... instead of bms shutting down load at battery protection level, would be nice with a definable lower level like 35% SoC. Have not so much experience of this part of the energy envelope as the system so far coped good with load :)

This would also allow one to test and make sure the protection mechanisms will work, without having to actually be at the edge of safe SoC range.

Haven't found howto do this, or should it be possible?
If no, perhaps add as a enhancement request?

SOC
1 comment
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

saxofon avatar image saxofon commented ·

and to clarify the obvious... these defined upper/lower limit should of course be *in addition* to the battery protect levels that BMS sense on already today.

0 Likes 0 ·
1 Answer
saxofon avatar image
saxofon answered ·

Ping! Anyone awake at Victron? ;-)

2 comments
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

Alexandra avatar image Alexandra ♦ commented ·

@saxofon

Are you off grid? On grid? Mobile?

This affects what programming can be done. Or advice that can be given.

And for the 100% on battery state of charge I think that the bms will handle the overcharge or held at high charge issues. Most bms designs never hold the internal cells at max anyway.l or even charge the that high.

For example winston cells can be charged to 3.85v but batteries that use them usually only keep then about 3.35v per cell and the bms tells the system it is at 100%. Even though technically they are not.

You could always program a load on ac2 to switch on and off if you really want the batteries to cycle if the system is unattended. Bit for the most part the system can run itself.

You can even program the multi on the charger page with the storage function so it 'refreshes' the system. When you are using ve configure you will see how the graph changes when you check the storage function .