We have installed a grid connected ESS system earlier this summer for a customer using his lead acid flooded batteries that need a monthly Equalisation.
The customer has been unable to perform an equalisation via the CCGX advanced menu for the Quattro.
I have been to site and managed to get equalisation to start, but it only runs for a few seconds then drops out to float.
The setup is a 10kVA Quattro with an SMA 4kW PV inverter set to off grid.
The batteries are staring to deteriorate now with low battery warnings popping up regularly.
Any suggestions? Thanks