Hi all, having just had an 8.35kwp PV system installed, I have a few niggling doubts in my mind. I believe I have 3 strings, one with 16 panels, and 2 with 4 panels on each. On the strings with 4 panels, I have one string with 2 panels orientated east and 2 to the west, and another string with 2 to the east and 2 to the south. I originally had optimisers fitted to these 2 stings but that fried 2 MPPTs so the installer removed them. My mind says that my string layout has now compromised my generation. Can anybody confirm this ?