Hi,
I had an enphase IQ system configured with a no-export profile. Just added a multi and ESS assistant, programmed the enphase to generate without limits. Problem is when the scheduled charge kicks in at 10am. The multi does not limit the charge based on Panel generation. It just use all power configured on the ESS "Maximum charge power" settings.
Is there any way to use the surplus power from the panels only?
Cheers and thanks for any info that can be given.