I plan to expand my System(actual setup):
-Multiplus 2 48/5000
-2x Fronius Symo 8.2 (20kWp Gerator Power)
-60kWh battery.
-CCGX
I would like to add 5-6kWp on a SmartSolar 250/100 directly to the battery.
So here the main questions:
Is it possible to monitor the battery still by the Mp II and Smartsolar 250/100 both connected to the CCGX? or is a Smartshunt / Lynx Shunt neccessary?