Hello, there is a system of three batteries connected to lynx ion bms, two mpp 100/20 and mppt 150/35 and one quattro inverter, all of them are connected to CerboGX. There was a problem when turning off the BMS when the main contactor opened, the solar controllers continue to supply voltage to the system from which part of the circuit is energized, an error is displayed on the monitor about the loss of communication with the BMS. Is it possible to somehow solve this problem, so that charging stops when BMS is turned off, mppt controllers are connected to the ve.direct cerbo cable