Hello, i am installing a boat with a two bank 24v system switched 1/2/both/off. Also a victron split charge diode which requires both banks -ve to be permanently linked. I have bought 2 bmv-700 monitors as I would like to have visual information on both battery banks at the same time. Will this work and which side of the 2 shunts should the link cable be on?