Hi all,
I have a 3 phase system using 3 x MultiPlus II.
I had loss of mains on one phase due to maintenance on the grid.
The hybrid system didn’t kick in. I had to turn off mains on three phases to simulate loss of mains for the hybrid system to work
Is there a setting to allow the system to run the back up loads when only one phase losers mains.