Ess setup, Feeding back to Grid. Fronius 3phase 10kw grid tied on Input. 2 phase setup Red and white on Backup. 4 x 5kw Multiplus II. 2 x In Parrallel.
Phase compensation OFF. ZERO feed in on. Ess selection Mode. Optimised without Battery life.
Set to 100%, when I lower it it feeds back to Grid.
Grid meter installed with CT's 100A/5A with EM24.
Pls email ebrahim@brighthousesolar.co.za
Soonest, appreciated. Thanks.
Site Name: Howe on Medburn