Is there a way to set an export limit to the grid using the CCGX unit or do i require external metering?
I know the fronius zero export will stop all export to the grid but is there a way i can set a specific value for how much is exported?
Curious of this for both applications when AC coupled inverter is on either the input or output of the multiplus.