Since the DVCC procedures/instructions are TBD regarding shared temperature sense "STS", what would be the best method of configuring MPPT battery charging on temperature cutoff:
- Using the CCGX DVCC option for STS by way of the BMV-712 battery temperature sensor as source, and setting the MPPT to cutoff parameter for 0 degree Celsius (32 degree Fahrenheit)?
- Or configuring VE Smart Networking to join the BMV-712 to the MPPT to cutoff solar charging batteries for the same temperature settings as aforementioned?