Hello,
after there was unfortunately not "the" solution in the German-speaking area I try it again in the English-speaking area.
I am looking for a technical solution for an off-grid solar system with Cerbo GX, Multiplus 2 and MPPT RS to carry out the periodic maintenance run of the diesel generator in summer under full load.
In other words, the MPPT RS would have to be switched off automatically beforehand AND the SOC value must have dropped so far that the generator can run at full load for several hours.
Is there a technical solution for this with the Cerbo GX?
I have already found the maintenance run function, but it does not work under the conditions described above
I look forward to your creative ideas