question

cyon avatar image
cyon asked

Timer mode - use batteries with timer

Hello

I want to put in a request on Victron Cerbo.

Timer mode or something:

Timer mode set that you can say, I want to use batteries from say 22h00 until 09h00 in the morning and if batteries get to say 40% SOC, It must start using Grid/Generator and stay at 40% SOC until the PV can charge it back up to 100%.

like Sunsynk got this option.

This will help so much.

Thank you

Not sure - Admin please assign or create
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

5 Answers
Alexandra avatar image
Alexandra answered ·

@Cyon

This is achieved with node red and venus os large.

Possibly dynamic ess as well. Although i have not tried it that way.

The other way is conditional ac connect can be done with victron connect.

A further way, which has been a favourite is to use, if you cant really program, is the generator start stop on the gx wired to a relay on the inverter. The relay programmed to connect or disconnect the programmable relay based on conditions set on the GX.

2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

cyon avatar image
cyon answered ·

I will need to learn node-red. I get so lost at the start.


1 comment
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

Alexandra avatar image Alexandra ♦ commented ·
It is pretty heavy going in the beginning.

There are plenty guys who have shared code with ideas.. A copy paste and tweaking works.

0 Likes 0 ·
cyon avatar image
cyon answered ·

can Node-RED tell Cerbo only to charge the batteries with PV first and after the Batteries are full to do supply load/grid feed..?

1 comment
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

Alexandra avatar image Alexandra ♦ commented ·
You can do that with wind solar priority.

https://www.victronenergy.com/live/ve.bus:solar-and-wind-priority

1 Like 1 ·
diederik avatar image
diederik answered ·

I have a MultiPlus-II GX, I guess it works the same way as your Cerbo.
To charge the battery first with PV I use ESS and Optimized (without BatteryLife) modus.
For your other question charging at night, I'm using Node Red.

2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

dangermouse avatar image
dangermouse answered ·

I use the relay out of the Cerbo to connect to the AUX of the multiplus. It gives a lot of functionality from VRM you can use quiet hours or periodic run.

You can set different SOC levels for quiet hours to normal.